
Well the Airstream project was put on hold for the past few months. One Saturday I deceided to replace a tile in our master bath. I got all my supplies ready to replace the tile, went upstairs, and started to remove a few loose tiles. One tile turned into 2, that turned into 4, to 8, to 16... after 20 minutes it was determined that I needed to replace all the tile. I was not planning on a bathroom remodel, but that

is what happened. It started out with a tile replacement, then moved to "I'll just re-tile the shower, to "lets do the whole bathroom", to "lets re-design the bathroom", to "lets tear down a few walls, re-locate the toilet, move the sink, put in a master closet, rewire the whole bathrrom, install a new subfloor, new tile floor, new tiled shower, new drywall, new insulation, new window, new plumbing, new waste lines, new vanity, new sink, new... " Needless to say 4 months later I have a usable master

bath.
